Energy Generation – hydropower

Clean hydropower energy

Water constantly moves forward – so does our technology

Schubert Elektroanlagen offers comprehensive concepts for hydroelectric power plants with an output of up to 30 MW. From personalized planning to delivery, installation and commissioning to maintenance and repair, Schubert Elektroanlagen offers the best service under one roof since 1965.

Complete electric/mechanical systems with the best workmanship:

Schubert Elektroanlagen assists private and public power plant operators as a full-service provider with mature, electrical plants, ultra-modern control systems and mechanical equipment – planned, constructed and commissioned in a turnkey fashion.

More than 400 hydropower projects in 25 different countries have been successfully developed worldwide.

In addition to the plants’ environmental sustainability, we place great importance on efficiency and cost advantages. As an independent service provider, we are able to guarantee customers the best value for their money thanks to the variety of available components for each application.

Electrical equipment of hydroelectric power plants:

  • Professional assistance during planning
  • Power plant installation
  • Visualization and data transmission
  • Web-based monitoring of plant data – WebControl
  • Medium-voltage systems
  • Transformers
  • Generators
  • Residual water regulations
  • Control units for fish ladders
  • Control and visualization systems

Mechanical equipment of hydroelectric power plants:

  • Professional assistance during planning
  • Turbines (Pelton, Kaplan, Francis)
  • Hydraulic regulator
  • Rack cleaner
  • Hydraulic steelwork
  • Reservoir management

The control system of the future – “Schubert Control System”:

Control and regulation software is at the heart of each system to ensure optimum and smooth 24-hour power plant operation. Our process know-how obtained from over 400 completed power plants at home and abroad is reflected in our software products. Our control systems stand out due to high availability and user-friendliness.

This lets the user himself decide whether he wishes to use the program with a touchscreen or if he prefers the conventional method of operating it with a mouse or touchpad. It is trivially easy to zoom into objects using the mouse wheel or simply with two fingers, which causes the next level to open. This process also functions inversely.

The user can also design the user interface himself by “dragging and dropping” program parts. Favorite views can thereby be saved so that they are available next time.

Depending on the customer’s wishes, alerts are issued via email, SMS or through a push notification on the iWatch and iPhone. The maintenance program manages all the technical data, the object’s life course and much more.


Turbine regulation:

Modern turbines regulator must meet the highest standards for safety, efficiency and availability. Schubert Elektroanlagen’s products offer all these advantages – both when installing new hydroelectric power plants and when modernizing and revitalizing existing power plants.

Our digital, microprocessor-controlled turbine regulation systems stand out due to their ideal effectiveness and optimum ease of use – irrespective of whether the system is manually-controlled or remotely monitored.

DIN 4321 is the foundation for the design (technical specifications for regulation systems).

A big emphasis on customer service:

To ensure optimum and error-free system operation, Schubert Elektroanlagen offers reliable solutions for remotely servicing and controlling power plants.

  • Safety inspection
  • Remote maintenance
  • Transformer maintenance
  • Cable inspection
  • Hardware and software updates

REFERENCE PROJECTS

New construction
Cemel 1 / 2 / 3 hydroelectric power plant,
Turkey
Construction period:
March 2012 to July 2015
Scope of assignment:

Planning, manufacturing, installation and commissioning all the electrical equipment incl. control technology (low pressure systems each with 2 sets of machinery - 8 MW)

New construction
Gudauri hydroelectric power plant,
Georgia
Construction period:
February 2012 to January 2013
Scope of assignment:

Planning, manufacturing, installation and commissioning all the electrical equipment incl. control technology (high pressure with 2 sets of machinery - 5 MW)

Revitalization
Lochham II hydroelectric power plant,
Austria
Construction period:
January 2015 to March 2015
Scope of assignment:

Planning, manufacturing, installation and commissioning the low-voltage switchboard and power plant automation (high pressure plant with 2 sets of machinery - 2 MW)

New construction
Stadl-Paura hydroelectric power plant,
Austria
Construction period:
August 2012 to May 2013
Scope of assignment:

Planning, manufacturing, installation and commissioning all the electrical equipment incl. control technology (low pressure system with 2 sets of machinery - 6 MW)

New construction
Stanzertal hydroelectric power plant,
Austria
Construction period:
March 2013 to December 2014
Scope of assignment:

Planning, delivery, installation and commissioning all the electrical equipment incl. control technology (high pressure plant with 3 sets of machinery - 15 MW)

New construction
Tulila hydroelectric power plant,
Tanzania
Construction period:
October 2013 to November 2015
Scope of assignment:

Planning, manufacturing, installation and commissioning all the electrical equipment incl. control technology (low pressure systems with 2 sets of machinery - 6 MW)

Revitalization
Verla (Werla) hydroelectric power plant,
Finland
Construction period:
August 2012 to January 2015
Scope of assignment:

Planning, manufacturing, installation and commissioning all the electrical equipment incl. control technology (low pressure system with 1 set of machinery - 1.6 MW)